Latest projects

Salaojaremontti Hämeenlinnassa

Moderni valkoinen talo ja nurmipiha

Veikko Koljonen’s 1990s detached house had its entire drainage system and stormwater drainage renewed. The old system was insufficient and did not properly direct water away from the building’s foundations. After the renovation, water is now safely directed away from the foundations, and the building’s moisture risk has been eliminated.

Moderni valkoinen talo ja nurmipiha

Veikko Koljonen’s 1990s detached house had its entire drainage system and stormwater drainage renewed. The old system was insufficient and did not properly direct water away from the building’s foundations. After the renovation, water is now safely directed away from the foundations, and the building’s moisture risk has been eliminated.

Kaksi työntekijää kävelee työmaan polulla ja tarkastelee projektin etenemistä

Leave a callback request

Kaksi työntekijää kävelee työmaan polulla ja tarkastelee projektin etenemistä

Leave a callback request

Our projects

Explore our completed projects and the quality of our work

Drainage blog

Drainage content